Hammer-Close-up view of a hammer.
Teaser-No parkerizing yet...
Scope base/rail-Welded, bead-blasted, ready to be welded to the gun.
Grip assemblies-Boxes full of them, awaiting one final operation.
Grip assembly #1- Here is one in the VMC, getting the final hole drilled and tapped.
Grip assembly #2-This is the entire pistol grip assembly. It uses all AR-15 parts except the disconnector.
Bolt #1-Shows the lug area of the bolt head.
Bolt #2-Front view of the bolt head.
Bolt #3-It's in there, believe me. Coolant blasts the part as the VMC does its job.
Bolt #4-Once the cutter pulls back and the coolant flow stops...
Bolts-A box full of them.
Barrel extension/receiver- Two of 'em...just back from heat treating and bead blasting.
Bolt assembly- Welded assembly using bolt head above. Slot is for camming the hammer back.
Parts- All parts, ready to be welded together.
Almost done- Welded, ready for test-firing.